A technical report often runs to several hundred pages, but the code fixes its structure. Knowing where to look saves days of due diligence.

The structure of an NI 43-101 report

Form 43-101F1 sets 27 items. The ones that matter most to a financier:

ItemContentWhat to check
1SummaryHeadline numbers and recommendations
4Property description and locationTenure, expiry dates, existing royalties
10 to 12Drilling, sampling, data verificationSpacing and quality control of assays (QA/QC)
13Mineral processing and metallurgical testingRepresentative samples, recovery
14 and 15Resource and reserve estimatesCategories, cut-off grade, price used
16 and 17Mining and recovery methodsDilution, strip ratio, process flowsheet
20Environment, permitting, socialMissing permits, tailings, communities
21Capital and operating costsContingency, comparison with peers
22Economic analysisPrice, rate, NPV, IRR, sensitivities

The JORC Table 1

In Australia the logic is “if not, why not”. Table 1 lists criteria to comment on in five sections: sampling techniques and data, exploration results, resource estimation, reserve estimation, and a section for diamonds and gemstones. A criterion answered vaguely is a signal.

An analyst’s reading order

  1. The economic analysis: which price, which rate, which NPV, which sensitivities.
  2. The price assumptions, against market consensus.
  3. Resources: share of inferred, drill spacing, cut-off grade.
  4. Reserves: dilution, losses, recovery assumed.
  5. Metallurgy: how many tests, and how representative.
  6. Capex: level of engineering and contingency, often around 10 to 20% of direct costs depending on the stage.
  7. Permits and social licence: what is still needed, and how long it will take.
A report has a date. Prices, costs and exchange rates may have moved since publication. Published NPVs often use prices above consensus: always rerun them on your own price deck.

Key takeaways

  • Item 22 gives the conclusion; items 13 to 17 tell you whether it holds.
  • Weak assay quality control undermines the whole estimate.
  • The person who signs carries professional liability.

Check your understanding

1. Which NI 43-101 item holds the economic analysis?
  1. Item 1
  2. Item 14
  3. Item 22
  4. Item 26

Answer: Item 22. Item 22; items 13 to 17 tell you whether it holds.

2. What does QA/QC check?
  1. The tax regime
  2. The reliability of assay results
  3. The permits
  4. The share register

Answer: The reliability of assay results. Blanks, standards and duplicates test the assays.

3. Why rerun a report’s NPV on your own price deck?
  1. Reports are never audited
  2. Prices and costs may have moved since the report date
  3. NI 43-101 forbids NPVs
  4. To avoid paying the QP

Answer: Prices and costs may have moved since the report date. A report is dated; markets move.